Mario Johnston
Well-Known Member
- Joined
- May 23, 2019
- Messages
- 743
26. Set the 3D printed pin collars in place as shown. These will face inward and away from the bulkhead notches. These will need to be epoxied in place around their flanges. There are 2 collars for the left sponson, and 5 collars for the right sponson.
27. Identify the inner sponson frame as shown. Clamp this to one of your rails and set the inner section in place. Each bulkhead will slot into its designated location, the pin supports should align with their holes in the frame. Epoxy in place
Collars epoxied in place
27. Identify the inner sponson frame as shown. Clamp this to one of your rails and set the inner section in place. Each bulkhead will slot into its designated location, the pin supports should align with their holes in the frame. Epoxy in place
Collars epoxied in place
Last edited: