nitro_nemesis
Well-Known Member
- Joined
- Nov 6, 2005
- Messages
- 164
Eh...you could be working on four at one time like me, talk about headaches. I've got one rigger that's nearly ready to run, two kits half built up from scratch, one mono and one rigger, and one tunnel that is about 3/4 of the way finished. Lots and lots of work to do, but it'll be worth it when spring gets here !!!
Excellent! Thanks for the advice. I should have the bottoms on tonight. I'll also experiment with mixing the sealing epoxy while it dries. As always I'll post my progress as I go. Is it normal to be thinking about my next project already?