ML Boatworks GSX310 Sport 20 31" prototype build - Nitro center section

Intlwaters

Help Support Intlwaters:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
I'm on the clock...no worries Charles! This build has been fun! The whole kit has fit together beautifully!! The tub frame tabs actually snapped into place with the tub's bottom skin!!! Strong too!! I may do an ML GSX 480 Gasser next.....

-Kent
 
I have been working on a couple different things, here is some build info on the GSX310 ride surfaces. Plenty of pics! Mike

Loading the sticks:

20160402_134142_zpsirihjjgj.jpg


20160402_134149_zpsxoi9hzuj.jpg


Next install the air release and non trip sheeting:

20160402_140004_zpsccbwl0eq.jpg


20160402_140007_zpsrx1wklx6.jpg


20160402_140827_zpsjt9xipbi.jpg


Now the primary pad:

20160402_141233_zpsh1dedxqc.jpg
 
Kent, btw, I just saw your post...yes, the rear dowel gets cut off at the engine well support! This opens up the engine well...plenty of strength without it being connected. Mike
 
Mixing West,sealing, sanding for skins...about ready to bond sponsons to the tub.... ; )
 
Mike I just bought one of these off of Kevin Sheeran. How much are the cowlings?

Is anyone building a Nitro Version yet?
 
Samual, $40 plus shipping. I am,building the nitro kit..that,is what my pics are in this build!
 
Got it Samuel. I laid up the cowling last night actually. It will ship out Monday. Thanks! Mike
 
A nice stand with Prop guard is now available for the GSX310 and GSX380 hulls! The prices are also a lot lower as I have changed the way they are made to minimize amount of cutting. I also modified the GP and SX series sport hydro stands to reduce cost on them as well. Same with the Universal Rigger Stands I offer! Check it out! Mike

GSX-310Sa_zpsksuqlftx.jpg


GSX-310S_zpsqbyjqw9k.jpg


GSX-310Sb_zpsdxpoynzx.jpg
 
Last edited by a moderator:
I figured I would share what the FE GSX310 layout looks like. This is with a UL-1 motor, and a Hyperion 4s, 5400mah, 35c pack. As you can see, tons of room!

20160927_072332_zpsghjuzdyk.jpg


20160927_072305_zpszoxsyfx2.jpg


20160927_072259_zpsiupu1shp.jpg


20160927_072236_zpsmlb9fubi.jpg


20160927_072231_zpssuzaaisd.jpg
 
So I see some are (I presume) jigging the frame up and then epoxy the boat together, after the frame and stringers are in place?
 
Last edited by a moderator:
Back
Top