- Joined
- Apr 20, 2011
- Messages
- 2,199
Hi Mark,
Nice work! Is the next project the gap bed lathe? Or maybe one of the really monster LeBlond or Monarch's? Maybe one like we had at Clarage Fan Corp. that turned the 36 inch dia. by 22 ft long shafts on the inducted draft fans for the Tennessee Valley Authority back in the 60's. The operator sat in a chair on the carriage and it took 8 hours to make a cut.
John
Nice work! Is the next project the gap bed lathe? Or maybe one of the really monster LeBlond or Monarch's? Maybe one like we had at Clarage Fan Corp. that turned the 36 inch dia. by 22 ft long shafts on the inducted draft fans for the Tennessee Valley Authority back in the 60's. The operator sat in a chair on the carriage and it took 8 hours to make a cut.
John