I had been going back and forth for months on how I wanted to set up the pipe mount, settled on a simple design the guys here run on their slingshots.
Early in the build I added a small piece of wood to the inner skeleton of the radio box wall in preparation for the pipe mount to be drilled through. I miscalculated slightly and missed a spot where the bolt would come through a hollow space in the tub wall. Not an awful fix!
Start by marking the hole that needs reinforcement. Again, this is a hollow wall. The hardware could potentially squeeze and crack the hull here or create leaks.
I cut a 3/8" dowel for my reinforcement and drilled the center.
View attachment 285687
Next is the most nerve wracking part: drilling holes in the tub
View attachment 285688
I slowly opened the hole up to 3/8" and inserted the dowel. Time to seal in for good.
View attachment 285689
A thickened epoxy mix to seal
View attachment 285690
Once the epoxy cured, I sanded the dowel down flush with the tub.
View attachment 285691
And here we are! Good strong mount point for the hardware without fear of splitting the tub wall.
(All appropriate bolt sizes and washers will be installed for final assembly!)