Steve Seebold
Well-Known Member
- Joined
- Sep 30, 2005
- Messages
- 1,207
His outdrives have been unavailable for a long time. I need one for a twin I’m starting on. Anybody have one for sale?
Just kidding.
I make the drives Ron sells but I’ve been so damned sick with cardiac issues this year that I haven’t even turned the machine on.
I have had 2 heart attacks this year and I was almost on my death bed, then on October 2nd, I got a new 3 lead pacemaker with a defibrillator implanted and now, I feel better every day.
I have material in the shop all cut up to start making 100 new drives.
The name of my business is “MID DAY MACHINING” because I seldom start work before 11:00 AM and I’m finished between 3:00 and 4:00 PM.
I’m thinking it’s going to take me a total of about 45 minutes to an hour per drive to complete one so I’m looking at 4 to 5 weeks to get 100 units done.
If I had a more powerful machine I could do them faster, but as my dad used to say, “IF A BULLFROG HAD WINGS IT WOULD’T BUMP ITS ASS WHEN IT JUMPED”.
I’ll do the best I can without killing myself.
Just kidding.
I make the drives Ron sells but I’ve been so damned sick with cardiac issues this year that I haven’t even turned the machine on.
I have had 2 heart attacks this year and I was almost on my death bed, then on October 2nd, I got a new 3 lead pacemaker with a defibrillator implanted and now, I feel better every day.
I have material in the shop all cut up to start making 100 new drives.
The name of my business is “MID DAY MACHINING” because I seldom start work before 11:00 AM and I’m finished between 3:00 and 4:00 PM.
I’m thinking it’s going to take me a total of about 45 minutes to an hour per drive to complete one so I’m looking at 4 to 5 weeks to get 100 units done.
If I had a more powerful machine I could do them faster, but as my dad used to say, “IF A BULLFROG HAD WINGS IT WOULD’T BUMP ITS ASS WHEN IT JUMPED”.
I’ll do the best I can without killing myself.