David Pillado
Member
- Joined
- Aug 29, 2012
- Messages
- 24
Been working on this Rigger since November and really happy now that its complete. This is my first CMD Rigger and must say I'm blown away with the quality of craftsmenship from Andy Brown's team. Have a few friends that made this build possible so here's a list of what's in her and the folks that made it possible. I thank you all
Alfred Lanza for helping me on the build
Matthew Waldron for the power plants, 2 M&D full mod 26's
Ken Larsen for helping me with the hardware
D9 Pipes from the master Don Shanks
Props from: Prop Works West, Peter Duggan CoCr and G-Force Hydros. Awesome work from all
Kevin Sheren for sellling me the kit
Conner Dillard for allowing me to use his shop to paint it
Daniel Place for added hardware support
and my Local Hobby Shop: J&M Hobbies in San Carlos (been going there since I was 10)
Maiden voyage is this weekend, looking forward to running her. Enjoy...
Alfred Lanza for helping me on the build
Matthew Waldron for the power plants, 2 M&D full mod 26's
Ken Larsen for helping me with the hardware
D9 Pipes from the master Don Shanks
Props from: Prop Works West, Peter Duggan CoCr and G-Force Hydros. Awesome work from all
Kevin Sheren for sellling me the kit
Conner Dillard for allowing me to use his shop to paint it
Daniel Place for added hardware support
and my Local Hobby Shop: J&M Hobbies in San Carlos (been going there since I was 10)
Maiden voyage is this weekend, looking forward to running her. Enjoy...
Last edited by a moderator: