Intlwaters

Help Support Intlwaters:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
chrome tank 001.jpg
Jim Allen

chrome tank 001.jpg

A complete chroming tank with heaters. The chrome tank is maintained at 130 deg. F. & is run at a current density of 3 amps/sq. in. The total current required for the brass holding fixture & the liner is 24 amps. The brass holding fixture prevents the buildup of chrome on the top & bottom of the liner. This build up takes place on the fixture & is removed afterwards with a warm 50% solution of HLC acid. At a current density of 3 amps/sq.in., .0012 in of chrome/side/hr. will be deposited. In 2 to 2.5 hrs, a total of .0024+ in of chrome should be deposited on the liner wall. If done properly, this simple bath will deposit smooth chrome with a hardness of 1,000 Vickers. Carbide tooling WILL NOT cut even 900 vickers chrome!
  • Like
Reactions: 2,000 people
There are no comments to display.

Media information

Album
chrome tank details
Added by
Jim Allen
Date added
View count
2,012
Comment count
0
Rating
0.00 star(s) 0 ratings

Image metadata

Device
OLYMPUS IMAGING CORP. D595Z,C500Z
Aperture
ƒ/3
Focal length
7.7 mm
Exposure time
1/50 second(s)
ISO
100
Flash
Auto, fired
Filename
3586-1122062042-chrome tank 001.jpg
File size
72.8 KB
Date taken
Thu, 21 July 2005 7:05 PM
Dimensions
640px x 480px

Share this media

Back
Top