I have the two 1/2 pre fitted together and opening rough cut out. I have the Engine rails in as well. In the next couple of days the center will get glued together. I also have the cowling almost ready to start cutting the Big intake scoop opening. I have all the Cad that I used to CNC the cowling plug . I have also made the plug for the cowling extention and will be pulling a part from that real soon.